Colonel Edwin Eugene Aldrin, Jr., United States Air Force, National Aeronautics and Space Administration Astronaut, in the Apollo 11 Lunar Module, Eagle, 20 July 1969. (Neil Alden Armstrong/NASA)
19 July 1969, 22:42 UTC, T + 81 hours, 10 minutes: Just over 58 minutes since the Apollo 11 spacecraft entered a circular orbit around the Moon, Lunar Module Pilot (LMP) Edwin E. “Buzz” Aldrin entered the Lunar Module Eagle to power it up and start systems checks in preparation for the descent to the Lunar surface.
Apollo 11/Saturn V AS-506 at the moment of first stage ignition, T -6.9 seconds, 13:31:53.9 UTC, 16 July 1969. (NASA)
On Wednesday morning, 16 July 1969, the Apollo 11/Saturn V launch vehicle, AS-506), stood on the pad at Launch Complex 39A, Kennedy Space Center, Cape Canaveral, Florida. On board were Neil Alden Armstrong, Mission Commander; Michael Collins, Command Module Pilot; and Edwin E. Aldrin, Jr., Lunar Module Pilot. Their destination was Mare Tranquillitatis, The Moon.
Neil Alden Armstrong, Michael Collins and Edwin E. Aldrin, Jr., flight crew of Apollo 11, 16–23 July 1969. (NASA)
The cryogenic liquid oxygen in the rocket’s propellant tanks cooled the humid Florida air to the point that frost formed on the tanks’ skin.
Saturn V AS-506 reaches full thrust. (NASA)Firing Room 1 at the Kennedy Space Center, 16 July 1969. (NASA)
The mission was on schedule. At T – 6.1 seconds (13:31:53.9 UTC) the first of the five F-1 engines ignited, followed in quick succession by the others. When the engines had reached full thrust, the pad’s hold-down arms were released. First Motion—10.47 m/s² (34.35 ft/s²)—1.07 gs, was detected at T + 0.3 seconds (13:32:00.3 UTC, 9:32:00.3 a.m., Eastern Daylight Time). The umbilical was released at T + 0.6 seconds. The Saturn V cleared the gantry tower and rolled onto its programmed course.
LIFT OFF! Apollo 11 (AS-506) launches from Launch Complex 39A, Kennedy Space Center, Cape Canaveral, Florida, at 13:32:00.06 UTC, 16 July 1969. (NASA)
The Saturn V rocket was a three-stage, liquid-fueled heavy launch vehicle. Fully assembled with the Apollo Command and Service Module, it stood 363 feet, 0.15 inches (110.64621 meters) tall, from the tip of the escape tower to the bottom of the F-1 engines. Fully loaded and fueled, AS-506 weighed 6,477,875 pounds (2,938,315 kilograms).
Apollo 11 climbs away from the pad. (NASA)
The Saturn V first stage was designated S-IC. It was designed to lift the entire rocket to an altitude of 220,000 feet (67,056 meters) and accelerate to a speed of more than 5,100 miles per hour (8,280 kilometers per hour). The S-IC stage was built by Boeing at the Michoud Assembly Facility, New Orleans, Louisiana. It was 138 feet (42.062 meters) tall, 33 feet, 1.2 inches (10.089 meters) in diameter, and had an empty weight of 287,531 pounds (130,422 kilograms). Fully fueled with 203,400 gallons (770,000 liters) of RP-1 and 318,065 gallons (1,204,000 liters) of liquid oxygen, the stage weighed 5,023,648 pounds (2,131,322 kilograms). It was propelled by five Rocketdyne F-1 engines, which were built by the Rocketdyne Division of North American Aviation, Inc., at Canoga Park, California.
Saturn V first stage Rocketdyne F-1 engines running, producing 7.5 million pounds of thrust. Ice falls from the rocket. The hold-down arms are releasing. (NASA)
The AS-506 S-IC stage’s five F-1 engines produced 7,552,000 pounds of thrust (33,593 kilonewtons). According to the post-mission flight evaluation report, “The F-1 engines performance levels during the AS-506 flight showed the smallest deviations of any S-IC Flight.” The center engine shut down at T + 135.20 to limit the rocket’s acceleration, and the outer four were shut down at T + 161.63 seconds.
The S-II second stage was built by North American Aviation, Inc., at Seal Beach, California. It was 81 feet, 7 inches (24.87 meters) tall and had the same diameter as the first stage. The AS-506 second stage weighed 79,714 pounds (36,158 kilograms), dry, and 1,058,140 pounds (479,964 kilograms), fueled. The propellant for the S-II was liquid hydrogen and liquid oxygen. The stage was powered by five Rocketdyne J-2 engines, also built at Canoga Park. Each engine produced 232,250 pounds of thrust, and combined, 1,161,250 pounds of thrust.
The Saturn V third stage was designated S-IVB. It was built by Douglas Aircraft Company at Huntington Beach, California. The S-IVB was 58 feet, 7 inches (17.86 meters) tall with a diameter of 21 feet, 8 inches (6.604 meters). The AS-506 S-IVB third stage had a dry weight of 24,852 pounds (11,273 kilograms) and fully fueled, it weighed 262,613 pounds (119,119 kilograms). The third stage had one J-2 engine which also used liquid hydrogen and liquid oxygen for propellant. At the first burn, the J-2 produced 202,603 pounds of thrust (901.223 kilonewtons). The S-IVB would place the Command and Service Module into Low Earth Orbit, then, when all was ready, the J-2 would be restarted for the Trans Lunar Injection. At this second burn, it produced 201,061 pounds of thrust (894.364 kilonewtons).
Apollo 11 Command and Service Module CSM-107 being assembled to the SA-506 Saturn V in the Vehicle Assembly Building, April 1969. (NASA)
The Apollo Command/Service Module was built by the Space and Information Systems Division of North American Aviation, Inc., at Downey, California. The Apollo 11 Command and Service Module, CSM-107, weighed 109,646 pounds (49,735 kilograms).
The SPS engine was an AJ10-137, built by Aerojet General Corporation of Azusa, California. It burned a hypergolic fuel combination of Aerozine 50 and nitrogen tetraoxide, producing 20,500 pounds of thrust (91.19 kilonewtons). It was designed for a 750 second burn, or 50 restarts during a flight.
The Apollo Lunar Module was built by Grumman Aerospace Corporation to carry two astronauts from lunar orbit to the surface, and return. There was a descent stage and ascent stage. The LM was intended only for operation in the vacuum of space, and was expended after use.
The LM was 23 feet, 1 inches (7.036 meters) high with a maximum landing gear spread of 31 feet (9.449 meters). It weighed 33,500 pounds (15,195 kilograms). The spacecraft was designed to support the crew for 48 hours, though in later missions, this was extended to 75 hours.
The Descent Stage was powered by a single TRW LM Descent Engine. The LMDE used hypergoloc fuel and was throttleable. It produced from 1,050 pounds of thrust (4.67 kilonewtons) to 10,125 pounds (45.04 kilonewtons). The Ascent Stage was powered by a Bell Aerospace Lunar Module Ascent Engine. This also used hypergolic fuels. It produced 3,500 pounds of thrust (15.57 kilonewtons).
Eighteen Saturn V rockets were built.
The Moon. The terminator is bisecting Mare Tranquillitatis. (Rob Pettengill)
Note: All timing, acceleration, weight/mass, and thrust data is from: Saturn V Launch Vehicle Flight Evaluation Report—AS-506, George C. Marshall Space Flight Center, MPR-SAT-FE-69-9, 20 September 1969.
20 April 1962: “Neil’s Cross-Country.” NASA Research Test Pilot Neil Alden Armstrong conducts a flight to test the Minneapolis-Honeywell MH-96 flight control system installed in the third North American Aviation X-15, serial number 56-6672. The new system combined both aerodynamic and reaction thruster flight controls in one hand controller rather than the two used in X-15s -670 and -671, simplifying the tasks for the pilot.
On its fourth flight, -672 was air-dropped from the Boeing NB-52B Stratofortress drop ship, Balls 8, over Mud Lake, Nevada. Armstrong fired the Reaction Motors XLR99-RM-1 engine and let it burn for 82.4 seconds. The X-15 accelerated to Mach 5.31 (3,789 miles per hour/6,098 kilometers per hour). After the engine was shut down, the rocketplane continued to its peak altitude on a ballistic trajectory, reaching 207,500 feet (63,246 meters) before going over the top and beginning its descent back toward the atmosphere. The test of the new flight control system went well.
Neil Armstrong began to pull out of the descent at about 100,000 feet (30,480 meters), but the X-15 “ricocheted” off the top of the atmosphere and climbed back to 115,000 feet (35,052 meters) where the aerodynamic control surfaces could not function. He used the reaction thrusters to turn toward the dry lake landing area at Edwards Air Force Base, but although the X-15 rolled into a left bank, it would not change direction and still in ballistic flight, went zooming by Edwards at Mach 3 and 100,000 feet in a 90° left bank.
As the X-15 dropped back into the atmosphere, Armstrong was finally able to get it slowed down, but he was far south of his planned landing site. By the time he got -672 turned around he was 45 miles (72.4 kilometers) to the south, over the Rose Bowl in Pasadena, and gliding through 45,000 feet (13,716 meters). There was real doubt that he would be able to make the X-15 stretch its glide to reach the dry lake.
In a masterful display of airmanship, Neil Armstrong was able to get the X-15 to reach the south end of the dry lake, 12 miles (19.3 kilometers) from the planned landing spot to the north. But it was a very close call. In debriefing, the pilots of the four F-104 chase planes were asked how much clearance Armstrong had as he crossed over the Joshua trees at the edge of the lake bed. One of them answered, “Oh, at least 100 feet—on either side.”
At 12 minutes, 28.7 seconds, this was the longest flight of the entire X-15 program. It is called “Neil’s cross-country flight.”
A U.S. Navy fighter pilot who flew 78 combat missions during the Korean War, Neil Armstrong became a civilian test pilot at NACA (National Advisory Committee on Aeronautics, the predecessor to NASA) in 1955. He made 7 flights in the X-15 before transferring to NASA’s Project Gemini in 1962.
Armstrong was command pilot for Gemini 8 and Gemini 11, commander of the backup flight crew of the Apollo 8 mission, and was commander of Apollo 11.
On 20 July 1969, Neil Alden Armstrong was the First Man To Stand on the Surface of The Moon.